ISOC SRN history

Version Date Summary
41.0.Phoenix 25-05-2016 Several SCREWs for Eaism and streamlining.
40.0.Peleus 25-11-2015 Several SCREWs for streamlining.
39.0.Odysseus 23-06-2015 Several updates in the TAC pages for AO13. Some streamlining changes for the Core.
38.0.Nestor 10-12-2014 POS checks improved. Change functionality in the PSF digester to ignore INSTRUMENT windows with TM_ONLY
37.2.Menelaus 22-09-2014 Important bug fix in core. And major changes in eaims.
37.1.Idomeneus 23-06-2014 Important release for the TAC pages. Minor changes in web and core
37.0.Helen 29-04-2014 Important release for the TAC pages. Minor changes in web and core
36.2.Diomedes 07-03-2014 Released PGT for AO12. Includes the new functionality to add coordinated time with Swift
36.1.Calchas 08-01-2014 Fixed bug for keeping the roll angles fixed except for perigee entry. Removed duplicated files from tar file.
36.0.Brieis 08-10-2013 Relaxed the need to slew to Perigee Entry in core and some other minor issues.
35.2.Aeneas 09-09-2013 PGT for AO11S
35.1.Ajax 11-07-2013 Fixes in Eaims, Core and Web
35.0.Agamemnon 30-05-2013 Fixes in Eaims
34.2.Achilles 10-04-2013 Fixes in CORE, PGT and TAC
34.1 15-01-2013 Fixes in OMC pointings, open/close slews parametrisation, log messages and web
34.0 15-01-2013 Fixes in OMC pointings, open/close slews parametrisation, log messages and web
33.2 13-11-2012 Few screws solved, including a memory leak in the reports library and fixing an important bug in the OSS
33.1 01-10-2012 Adding the unscheduled gaps as a comment in the POS. Also implementing a way to generate only OLS in the POS
33.0 30-07-2012 Using FITS file exposure maps
32.2 04-06-2012 Ping pong filters release and few minor changes
32.1 07-05-2012 Ping pong filters release and few minor changes
32.0 05-03-2012 AO10 1st phase release
31.1 16-12-2011 TOO Form and Ping-pong filters release
31.0 06-10-2011 POST AO9 2nd phase release
30.0 18-08-2011 AO9 2nd phase release
29.1.1 10-06-2011 Urgent fix SPR1310
29.1 31-05-2011 Minor release
29.0 28-04-2011 AO-9 open time phase
28.0 07-03-2011 AO-9 open time phase
27.2 02-02-2011 General maintenance
27.1.2 01-12-2010 Urgent release of SCR 1177 implementation
27.1.1 24-11-2010 Urgent release of fix for SPR 1218
27.1 08-11-2010 Source diagnostic tool
27.0 18-10-2010 Source diagnostic tool
26.2 08-09-2010 PGT usability improvement SCR 1207
26.1 02-09-2010 Urgent fixes to proposal submission
26.0 30-08-2010 AO8 subscription phase
25.3 18-06-2010 Email templates fix (SCR 1172)
25.2 10-06-2010 Urgent Misalignment matrix fix (SPR 1171)
25.1 10-06-2010 AO8 post-TAC Release
25.0 15-04-2010 AO8 TAC Preparation Release
24.0 15-03-2010 AO8 1st phase Release
23.5 01-02-2010 Java 6 migration
23.3 15-01-2010 Urgent fix for SPR 1125
23.2 30-11-2009 Regular maintenance as per CCB
23.1 16-10-2009 TAC notification results and not-urgent screws
23.0 01-09-2009 TAC preparation and post-TAC procedures
22.0 19-05-2009 AO7 subscription release.
21.1 30-03-2009 Post-AO7 proposal release including some new bulk change features.
21.0.1 11-02-2009 Fixing the proposal counter on our internal webpage.
21.0 09-02-2009 Mantis migration, mailman list synchronization and SPI annealing flag
20.1 13-01-2009 Two minor sprs
20.0 24-11-2008 New AO7 proposal schema.
19.4.1 22-09-2008 Urgent release for updating "Amalgamation" with new 5x5 sequential pattern
19.4 09-09-2008 Email Maintenance Manager + some screws and sprs.
19.3 14-07-2008 PPD enhancements + some screws and sprs.
19.2 04-06-2008 Fixing various screws and sprs.
19.1 20-05-2008 Fixing various screws and sprs.
19.0 15-04-2008 Fixing various screws and sprs, urgent PGT bugfix and new FD distribution.
18.2 12-03-2008 Fixing memory leaks in the web application.
18.1 10-03-2008 Fixing some SCREWs and SPRs
18.0 25-02-2008 AO6 release
17.1 04-01-2008 Fixing the closure of database session in the web application.
17.0 17-12-2007 Fixing warning message for long slews and other minor changes
16.2 10-12-2007 Fixing some SCREWs and SPRs
16.1 29-11-2007 Fixing some SCREWs and SPRs
16.0.1 12-11-2007 Fixing Sequential Roll Angle Strategy
16.0 03-10-2007 AO6 KP release
15.3 31-07-2007 Improving 15.2, warn when doing large slews in eclipse season and other miscellani
15.2 22-07-2007 Stepping roll angle plus miscellani
15.1 20-06-2007 Various SPR's
15.0 04-06-2007 Bulk change to statuses
14.5.2 14-05-2007 Roll angle fix for AOCS calibrations (SPR 838)
14.5.1 18-04-2007 Urgent maintenance regarding AO tools and software
14.5 10-04-2007 New pattern calculator, proposal printing system, exposure maps on web and fix OTE SPR 828.
14.4 05-03-2007 Ready for AO-5. Ready for new PSF ICD v. 2.7.
14.3 12-02-2007 Finalize Scheduling Status Pages (SCR375)
14.2.1 25-01-2007 Fix of SPR 816 (web application only)
14.2 25-01-2007 Fix of SPR 812
14.1 24-01-2007 Prototype of scheduling status web-page (and required file-logging), database clean-up
14.0 04-12-2006 Large number of SPR's and Screws and code clean-up
13.1.1 10-10-2006 Fix SPR 799, to enable scheduling of observations with non-default parameters
13.1 03-10-2006 Update to enable scheduling of Key Programme
13.0 03-10-2006 Update to enable scheduling of Key Programme
12.6.1 10-08-2006 Web-application update
12.6 07-08-2006 Various different Screws and SPRs
12.5 12-07-2006 Improved handling of handovers
12.4.2 06-07-2006 Screw 567: Non-observational constraints during slew window
12.4.1 14-06-2006 Fixes for SPR 782 and 783
12.4 05-06-2006 New feature highlights: default telemetry settings, instrument modes and parameter defaults handling, perigee entry attitude selection plus the solved SPRs mentioned below.
12.3.6 31-05-2006 SPR 781: Timezone on FD server
12.3.5 25-04-2006 SPR 774: Perigee passage
12.3.4 21-04-2006 SPR 763, proposal printing
12.3.3 17-04-2006 SPR 762 (PSF import) and exposure map in web-app
12.3.2 07-04-2006 PHS mass printing improvement
12.3.1 29-03-2006 Fixes for SPR's 751 and 754
12.3 28-03-2006 Enabling proposal submission over port 80, AO printing
12.2.2 13-03-2006 Fix for SPR 752 in PGT
12.2.1 10-03-2006 Fix a few problems to be ready for AO-4 opening
12.2 06-03-2006 Release ready for AO-4 proposal submission period
12.1.1 16-02-2006 Preliminary fix for SPR 739
12.1 08-02-2006 Key Programme implementation and host of other improvements.
12.0.1 09-01-2006 Fix of SPR 725 (web application)
12.0 14-12-2005 AO4 release. General set of JEMX settings and new PGT, PRV and PLD
11.3.2 08-12-2005 Fixed copy proposal problem and short-term solution for PSF import problem
11.3.1 01-12-2005 Database update: fixed list of schedulable observations
11.3 22-11-2005 Improved IODB import plus a dozen other SCREWs and SPRs
11.2.2 2-11-2005 Fixed SPR 706: Unable to unschedule any revolutions, if the list of imported PSFs shows a gap.
11.2.1 25-10-2005 Several small issues fixed
11.2 20-10-2005 Unsplit functionality, Hex with COP, schedule notification, limit schedule time, many Starmap improvements
11.1.5 27-09-2005 SPR 699 fixed ('Select GCDE' button can reset dwell time and clear pointings)
11.1.4 01-09-2005 SPR 696 fixed (dwell time recalculated)
11.1.3 29-08-2005 SPR 692 fixed (command line tools not working)
11.1.2 19-08-2005 SPR 693 fixed (missing amalgamation links on web)
11.1.1 18-08-2005 SPR 691 fixed (error in OSS sky display)
11.1.0 16-08-2005 New IODB imported plus several SPRs and SCREWs implemented
11.0.0 13-07-2005 Custom raster and fix for SPR 674
10.9.4 17-06-2005 Patch 3 for core v10.9.0 released which implements screw 480
10.9.3 16-06-2005 Patch for SPR 672
10.9.2 03-06-2005 Patch for SPR 671
10.9.1 16-05-2005 SPR 667 fixed
10.9.0 28-04-2005 Several SPR's and SCREW's plus new Starmap and new web application
10.8.2 06-04-2005 Short-term solution for SCREW 400 implemented
10.8.1 31-03-2005 Fixed SPR 661
10.8.0 14-03-2005 Implemented SCREW 461, fixed several SPR's
10.7.4 07-03-2005 Implemented SCREW 465
10.7.3 18-02-2005 Implemented SCREW 464
10.7.2 25-01-2005 Fixed SPR's 650 and 652
10.7.1 13-01-2005 Fixed SPR's 647 and 648
10.7.0 06-01-2005 New GCDE surveys have been added plus split functionality
10.6.5 14-12-2004 Database update and patch for screw 458 plus web is updated for screw 457
10.6.4 14-12-2004 HOTFIX (2) for SPR 641
10.6.3 08-12-2004 HOTFIX for SPR 641
10.6.2 26-10-2004 Database patch for SPR 633, 634 and 635
10.6.1 25-10-2004 New COP pattern definition, dwell time calculation changed and several SPR's fixed
10.6.0 20-09-2004 Custom pattern, new OSS selection screen and new version of OMC (3.7)
10.5.1 13-09-2004 PGT changed for AO-3