Author: | Mathijs Homminga [mathijs.homminga@esa.int] |
Date: | 16-08-2005 |
Summary: | New IODB imported plus several SPRs and SCREWs implemented |
System name | ID | Version |
---|---|---|
ISOC Core System (PHS, OSS and CSS) | core | 11.1.0 (new) |
ISOC Database | DB | 4.2.1 (new) |
ISOC Web | web | 2.1.0 (new) |
Proposal Generation Tool | PGT | 3.3.0 |
Proposal Receiver | PRV | 1.4.0 |
Proposal Loader | PLD | 3.2.0 |
Mailer Daemon | MLR | 1.2.0 |
Calculation Engine | CLC | 1.1.0 |
Push Pull Daemon | PPD | 1.2.0 |
External dependencies:
System name | ID | Version |
---|---|---|
Integral File Transfer System | IFTS | 2.0 |
Observation Time Estimator | OTE | 3.0.2 |
Target Visibility Predictor | TVP | 3.0.1 |
Flight Dynamics Software | FDS | 2.2i |
Database of Observable Bins | DBOB | 76 |
Optical Monitoring Camera Pointing Software | OMC | 3.7 |
ED Viewer | IODB | 20.07.05 (new) |
SCR 483 | Latest IODB imported. |
SPR 669 | Fixed |
SPR 673 | The time axis is now always correct | |
SPR 682 | All ISOC software components now use the GMT timezone |
SPR 676 | GPS is now plotted correctly (based on start and end pointing) |
SPR 689 | Implemented as proposed |
SCR 302 | It is now possible to navigate between observations while the instrument and source window are still opened. |
SCR 433 | It is now possible to filter on (search for) proposal ID | |
SCR 442 | Title added | |
SCR 459 | Buttons reorganized |
SPR 680 | When the database was updated to include the new custom raster functionality, the procedure for generation IOP's was not updated. Now fixed. | |
SPR 681 | Businessrule 52 updated. | |
SPR 683 | Splitted observations are no longer set to completed. Their status remains scheduled. | |
SPR 684 | Fixed by setting the start pointing of the new observation to the last pointing + 1 (or -1 when doing the pattern backwards) of the original observation. Note that this means that any pattern can have a start pointing now, not only GPS and GCDE. However, the start pointing of a 5x5, HEX cannot be changed by the user. | |
SPR 686 | The Fix JEMX database procedure is updated such that it also fixes the IBIS parameters. This is a short-term fix, the actual problem will be solved in screw 501 |
SCR 474 | The default parameters for GPS and GCDE surveys are now frozen at schedule time, instead of observation creation time. |
SCR 478 | The approved target lists are now also available for download in ASCII CSV (Comma Separated Value) file. The HTML target page contains a link to the csv version. |