Author: | Mathijs Homminga [mathijs.homminga@esa.int] |
Date: | 16-08-2005 |
Summary: | Fixed several SPRs and implemented SCREW 474 on GPS and GCDE default parameters |
SPR 680 | When the database was updated to include the new custom raster functionality, the procedure for generation IOP's was not updated. Now fixed. | |
SPR 681 | Businessrule 52 updated. | |
SPR 683 | Splitted observations are no longer set to completed. Their status remains scheduled. | |
SPR 684 | Fixed by setting the start pointing of the new observation to the last pointing + 1 (or -1 when doing the pattern backwards) of the original observation. Note that this means that any pattern can have a start pointing now, not only GPS and GCDE. However, the start pointing of a 5x5, HEX cannot be changed by the user. | |
SPR 686 | The Fix JEMX database procedure is updated such that it also fixes the IBIS parameters. This is a short-term fix, the actual problem will be solved in screw 501 |
SCR 474 | The default parameters for GPS and GCDE surveys are now frozen at schedule time, instead of observation creation time. |