core SRN history

Version Date Summary
22.3 25-05-2016
22.1.2 23-06-2015
22.0 22-09-2014 Added Swift time to Core and minor changes.
21.1 22-09-2014 Added Swift time to Core and minor changes.
21.0 23-06-2014 Added Swift time to Core and minor changes.
20.2 29-04-2014 Fixed Amalgamation tool and adding a check box for strict slew to perigee entry strategy in PHS.
20.1 08-01-2014 Fixed bug for keeping the roll angles fixed except for perigee entry. Removed duplicated files from tar file.
20.0 08-10-2013 Relaxed the need to slew to Perigee Entry in OSS and some other minor issues.
19.4 11-07-2013 Important perigee passage angle conservation and cosmetic reduction of messages in OSS.
19.3 10-04-2013 Important EO, and OMC related ids have been solved. Also, some log presentation ids have been improved
19.2.1 15-01-2013 Important EO, and OMC related ids have been solved. Also, some log presentation ids have been improved
19.1 13-11-2012 Few screws solved, including a memory leak in the reports library and fixing an important bug in the OSS
19.0 30-07-2012 Changed use of exposure maps in FITS format instead of ASCI.
18.2 30-07-2012 Changed use of exposure maps in FITS format instead of ASCI.
18.1 04-06-2012 Few post-TAC fixes
18.0 07-05-2012 Ping pong filters release and few minor changes
17.3 02-03-2012 Small changes to update AO related functions
17.2.1 16-12-2011 Ping pong filters release
17.1 06-10-2011 POST AO9 2nd Phase release
17.0 18-08-2011 AO9 2nd Phase release
16.2 10-06-2011 Urgent release to fix SPR1310
16.1 31-05-2011 PSF import, Sky map display
16.0 30-04-2011 Conflicts on ToO proposals
15.9 07-03-2011 AO9 open time phase and some other screws/sprs
15.8 02-02-2011 Regular maintenance
15.7.2 01-12-2010 Urgent release of fix SCR 1177
15.7.1 24-11-2010 Urgent release of fix for SPR 1218
15.7 08-11-2010 Source Diagnostic Tool tunning
15.6 18-10-2010 Source Diagnostic Tool and OMC calibrations
15.5 20-08-2010 AO8 2nd phase and exposure maps
15.4.1 18-06-2010 Urgent release in order to fix SCR 1172: Update notification to PI email templates
15.4 09-06-2010 Urgent release in order to fix SPR 1171: Exception misalignment calculation when generating POS
15.3 09-06-2010 Screws and SPRs
15.2 15-04-2010 Screws and SPRs
15.1 15-03-2010 AO8 Release
15.0 21-01-2010 Java 6 migration
14.7.1 15-01-2010 Fix SPR1125: type '4' proposals could not be scheduled
14.7 30-11-2009 Screws and SPRs
14.6 16-10-2009 TAC notification
14.5 01-09-2009 PAD Format Change / Subscription rejection
14.4 19-05-2009 PAD Format Change / PHS to PGT conversion
14.3 30-03-2009 Bulk change improvements and TAC comments per e-mail
14.2 09-02-2009 Fixure of Flight Dynamics Command Line tools and KP notification e-mail.
14.1 13-01-2009 Fixure of Flight Dynamics Command Line tools and KP notification e-mail.
14.0 24-11-2008 Email Maintenance Manager application.
13.4 22-09-2008 Email Maintenance Manager application.
13.3 08-09-2008 Email Maintenance Manager application.
13.2 14-07-2008 Fixture of 1 SPRs and implementation of 1 SCREWs.
13.1 20-05-2008 Fixture of 1 SPRs and implementation of 1 SCREWs.
13.0 20-05-2008 Fixture of 1 SPRs and implementation of 1 minor SCREWs.
12.19 14-04-2008 Fixture of 3 SPRs and implementation of 2 minor SCREWs.
12.18 03-03-2008 Fixing some SCREWs and SPRs.
12.17 25-02-2007 Flagging duplicate proposals.
12.16 13-12-2007 Fixing spurious warning messages for long slews.
12.15 10-12-2007 This new delivery fixes some SPRs and SCREWs
12.14 29-11-2007 This new delivery fixes some SPRs and SCREWs
12.13 12-11-2007 Fixing Sequential Roll Angle strategy not working
12.12 03-10-2007 Various SCREW's and SPR's
12.11 26-07-2007 Various SCREW's and SPR's
12.9 22-07-2007 Stepping of roll angle through patterns plus miscellani
12.8 20-06-2007 Various SPR's
12.7 04-06-2007 Bulk change of statuses
12.6 14-05-2007 Fix for roll angle problem in AOCS calibration
12.5 10-04-2007 Rewrite of proposal printing system, dither pattern generator
12.4 23-02-2007 Allowing for new PSF ICD. Ready for AO-5.
12.3 12-02-2007 SPRs 815 and 817
12.2 25-01-2007 Fix for SPR 812: Roll angle vs. position angle mix-up
12.1 24-01-2007 Database clean-up. Adding of PPD logging facilities.
12.0 4-12-2006 Numerous Screws and SPR's
11.19 10-10-2006 Creating Key Programme proposals
11.18 03-10-2006 Creating Key Programme proposals
11.17 04-09-2006 Scheduling of Key Programme observations
11.16 07-08-2006 Various Screws and SPRs
11.15 11-07-2006 Improved handling of handovers in OSS.
11.14.2 06-07-2006 Screw 567: Non-observational constraints on slew windows
11.14.1 14-06-2006 Fixes for SPR's 782 and 783
11.14 05-06-2006 Default value handling, Eclipse file updates, OSS perigee handling
11.13.2 25-04-2006 Fix for SPR 774: Perigee passage constraints
11.13.1 21-04-2006 Fix for SPR 763: text overlap in proposal prints
11.13 17-04-2006 Fix for SPR 762: PSF import problem with slew windows
11.12 07-04-2006 Enable mass printing to file
11.11 29-03-2006 Fixes for SPR's 751 and 754
11.10 28-03-2006 GUI refresh problems addressed and subscription handling finalized.
11.9.1 13-03-2006 Update to version 4.0.5 of PGT library
11.9 10-03-2006 Fix for SPR 747 and screw 527
11.8 06-03-2006 AO-4 release, ready to start proposal submission period
11.7 16-02-2006 Preliminary fix for SPR 739
11.6 08-02-2006 Implementation of Key Programme
11.5 14-12-2005 General set of JEMX settings and Simbad source check
11.4.1 08-12-2005 Fixed copy proposal problem and short-term solution for PSF import problem
11.4 22-11-2005 Improved IODB import plus a dozen other SCREWs and SPRs
11.3.1 2-11-2005 Fixed SPR 706: Unable to unschedule any revolutions, if the list of imported PSFs shows a gap.
11.3 25-10-2005 Fixed two SPR's related to GPS in Starmap and changed the way the manual time limit in OSS is handled
11.2 17-10-2005 Unsplit functionality, Hex with COP, schedule notification, limit schedule time, many Starmap improvements
11.1.3 01-09-2005 SPR 696 fixed
11.1.2 29-08-2005 SPR 692 fixed (command line tools not working)
11.1.1 18-08-2005 SPR 691 fixed (error in OSS sky display)
11.1.0 16-08-2005 Added custom raster functionality
11.0.0 13-07-2005 Added custom raster functionality
10.9.0.p3 17-06-2005 Implementation of screw 480
10.9.0.p2 08-06-2005 Patch for SPR 672
10.9.0.p1 03-06-2005 Patch for SPR 671
10.9.0 28-04-2005
10.8.0.p1 06-04-2005 Short-term solution for SCREW 400 implemented
10.8.0 14-03-2005 Several SPRs fixed plus many SCREWs implemented (example: Misalignment now possible on every instrument)
10.7.0 06-01-2005 Several SPRs fixed plus many SCREWs implemented (example: split observation functionality added)
10.6.1 25-10-2004 New COP pattern definition, dwell time calculation changed and several SPR's fixed
10.6.0 17-08-2004 Custom pattern and new OSS selection screen
10.5.0 11-08-2004 Wandering COP and copy proposal functionality added