Software Release Note for core version 10.8.0

(click here for SRN history)

Author: Frans Jacobs [frans.jacobs@sciops.esa.int]
Date: 14-03-2005
Summary: Several SPRs fixed plus many SCREWs implemented (example: Misalignment now possible on every instrument)

Dependencies

System name ID Version
ISOC Database DB 4.1.6 (new)

Fixed SPRs:

PHS:

SPR 630 Cache not flushed. Fixed, OSS was using the PHS connection
SPR 651 The AO selection for Amalgamation preparation was shown in a listbox which did not scroll, therefor in could only show 3 AO's. This has been replaced by a Combobox which now shows all AO's available in the database
SPR 657 On Linux the ProposalSelection screen freezes whet it is started as the first screen, this is now fixed

OSS:

SPR 649 Fixed, SPR was actually on PHS instead of OSS
SPR 654 Inaccurate wandering COP navigation, Fixed
SPR 658 Incorrect Misalignment, since lauch we do an incorrect correction for SPI misalignment, i.e., we do NOT point the satellite such that a source falls at the center of the FOV of an instrument. This problem was idependently reported by the IBIS team at the ISWT in Jan. 2005, and by going thoug the OSS code to implemt SCREW 461. Problem fixed, confirmed by the OMC team

WEB:

SPR 659 Can not raise SPR's and SCREWS, cause by the web server migration of RSSD, now fixed

Implemented SCRs:

PHS:

SCR 461 The misalignment now depends on the prime instrument setting, an extra option is added, startracker. If the Startracker is selected there is no misalignment correction done for any instrument. Chosing one of the Instruments mean that a misaligment is performed for the selected instrument, option "Both" means 'SPI' (as previously)

Other changes/comments: