Author: | Silvia de Castro [scastro@sciops.esa.int] |
Date: | 06-10-2011 |
Summary: | POST AO9 2nd Phase release |
System name | ID | Version |
---|---|---|
ISOC Database | DB | 9.8 |
![]() |
SPR 1196 | Dwell time calculation in bulk change observations is done on observation basis, from this release on. This means that it will take approved/requested time and pattern details of each observation to calculate the dwell time. |
![]() |
SPR 1242 | OMC window size field can be updated in the instrument window. The value is saved in the observation table in the database and it is used to build the OMC input file (extension row) for the OMC Pointing Software. |
![]() |
SPR 1333 | Manual inserted RWB are not allowed in the slew bar anymore. To manually add a RWB use the instrument bar. (Then, we will avoid violating ISOC-MOC ICD placing manual RWB in SATENG windows). |
![]() |
SPR 1331 | eAIMS has been updated to allow do long-term plan for AO-9 (v6.1) |
![]() |
SCR 1341 | Proposals with priority 4 have been updated to show "none" as its grade. |