Software Release Note for ISOC version 11.2.1

(click here for SRN history)

Author: Mathijs Homminga [mathijs.homminga@esa.int]
Date: 25-10-2005
Summary: Several small issues fixed

Dependencies

System name ID Version
ISOC Core System (PHS, OSS and CSS) core 11.3 (new)
ISOC Database DB 5.1 (new)
ISOC FD Server application fdserver 1.0
ISOC Web web 2.3 (new)
Proposal Generation Tool PGT 3.3.0
Proposal Receiver PRV 1.4.0
Proposal Loader PLD 3.2.0
Mailer Daemon MLR 1.2.0
Calculation Engine CLC 1.1.0
Push Pull Daemon PPD 1.2.0

External dependencies:

System name ID Version
Integral File Transfer System IFTS 2.0
Observation Time Estimator OTE 3.0.2
Target Visibility Predictor TVP 3.0.1
Flight Dynamics Software FDS 2.2i
Database of Observable Bins DBOB 76
Optical Monitoring Camera Pointing Software OMC 3.7
ED Viewer IODB 20.07.05

Fixed SPRs in core v11.3:

Starmap:

SPR 702 When start and end point are not specified for a GPS observation, then Starmap will show all (150) points.
SPR 703 Starmap will now show the point numbers for GPS and static (survey and custom pointing) patterns.

OSS:

SPR 705 The use of the manual time limit in OSS has changed: the user now has to specify the maximum number of seconds he wants to schedule in the current scheduling session, excluding the time which has already been scheduled before.

Implemented SCRs in web v2.3:

SCR 513 Implemented as proposed