Software Release Note for ISOC version 10.7.0

(click here for SRN history)

Author: Mathijs Homminga [mathijs.homminga@rssd.esa.int]
Date: 06-01-2005
Summary: New GCDE surveys have been added plus split functionality

Dependencies

System name ID Version
ISOC Core System (PHS, OSS and CSS) core 10.7.0 (new)
ISOC Database DB 4.1.4 (new)
ISOC Web web 1.2.1
Proposal Generation Tool PGT 3.3.0
Proposal Receiver PRV 1.4.0
Proposal Loader PLD 3.2.0
Mailer Daemon MLR 1.2.0
Calculation Engine CLC 1.1.0
Push Pull Daemon PPD 1.1.0

External dependencies:

System name ID Version
Integral File Transfer System IFTS 2.0
Observation Time Estimator OTE 3.0.2
Target Visibility Predictor TVP 3.0.1
Starmap Starmap 2.3.0
Flight Dynamics Software FDS 2.2i
Database of Observable Bins DBOB 76
Optical Monitoring Camera Pointing Software OMC 3.7
ED Viewer IODB 19.04.04

Fixed SPRs in core v10.7.0:

PHS:

SPR 636 The value of the parameter is not checked during typing but only after pressing enter or committing the observation.
SPR 637 The flux is now printed correctly.
SPR 643 The start and end point limits of GCDE patterns are now determined dynamically.

OSS:

SPR 638 The fixed time observations are now correctly ordered based on their starting time.
SPR 640 A warning is shown when the user attempts to unschedule a revolution that is earlier than one that is not currently unscheduled. The user should always unschedule the later revolution first. This warning will also appear if the user attempts to unschedule the last revolution when rev n+1 has also been loaded (which is always the case if it exists in the database). In this cased the user should ignore the warning.

Implemented SCRs in core v10.7.0:

POS Checker:

SCR 410 Implemented as proposed

PHS:

SCR 427 The approved duration is adjusted automaticaly when the start and/or end pointings are changed (and the observation is commited)
SCR 431 You can now split an observation. Splitting an observation is similar to copying it, except that the durations and start- and endpointings are handled correctly. One can only split (partly) scheduled observations. The system keeps a link between the splitted observations (no need to copy parent observations)

OSS:

SCR 428 When a user wants to reschedule a revolution, the system shows a pop-up dialog asking if the user wants to freeze the GS handovers.
SCR 449 The IFTS source (SAC/SOC) is now configurable (isocx.ifts.source property).

Fixed SPRs in DB v4.1.4:

SPR 644 The dominant properties were not applied correctly. The amalgamation package has been updated to fix this
SPR 646 Some database views and functions still used the old way of linking observations. They now use the new link table x_obs_obs. Details: updated views: v_obs, v_iop and v_pod, updated function: f_child_obs.

Implemented SCRs in DB v4.1.4:

SCR 447 The new GCDE surveys have been imported into the database