Author: | Paul Balm [paul.balm@sciops.esa.int] |
Date: | 29-03-2006 |
Summary: | Fixes for SPR's 751 and 754 |
System name | ID | Version |
---|---|---|
ISOC Core System (PHS, OSS and CSS) | core | 11.11 (new) |
ISOC Database | DB | 6.3 |
ISOC FD Server application | fdserver | 1.4 |
ISOC Web | web | 2.5 |
Proposal Generation Tool | PGT | 4.1 |
Proposal Receiver | PRV | 2.0.0 |
Proposal Loader | PLD | 4.2 |
Mailer Daemon | MLR | 2.0.0 |
Push Pull Daemon | PPD | 1.3 |
ISOC Observing Time Estimator | ote | 4.2 |
ISOC Target Visibility Predictor | TVP | 4.0 |
External dependencies:
System name | ID | Version |
---|---|---|
Integral File Transfer System | IFTS | 2.0 |
Flight Dynamics Software | FDS | 2.2i |
Database of Observable Bins | DBOB | 88 |
Optical Monitoring Camera Pointing Software | OMC | 3.7 |
OMC Source Catalogue | OMC_CAT | 5 |
ED Viewer | IODB | 11.01.06 |
SPR 751 | The 'Update approved' button for GPS observations did not work correctly. This has been fixed. |
SPR 754 | In specific cases, when MOC has specified a hand-over (i.e. not recommended), or the 'Fix GSHO' checkbox had been checked, the scheduling would still move the hand-over, or some of the related ED's. This has been fixed. (developer report) |