Software Release Note for ISOC version 10.8.0

(click here for SRN history)

Author: Frans Jacobs [frans.jacobs@sciops.esa.int]
Date: 14-03-2005
Summary: Implemented SCREW 461, fixed several SPR's

Dependencies

System name ID Version
ISOC Core System (PHS, OSS and CSS) core 10.8.0 (new)
ISOC Database DB 4.1.6 (new)
ISOC Web web 1.2.3
Proposal Generation Tool PGT 3.3.0
Proposal Receiver PRV 1.4.0
Proposal Loader PLD 3.2.0
Mailer Daemon MLR 1.2.0
Calculation Engine CLC 1.1.0
Push Pull Daemon PPD 1.1.0

External dependencies:

System name ID Version
Integral File Transfer System IFTS 2.0
Observation Time Estimator OTE 3.0.2
Target Visibility Predictor TVP 3.0.1
Starmap Starmap 2.3.0
Flight Dynamics Software FDS 2.2i
Database of Observable Bins DBOB 76
Optical Monitoring Camera Pointing Software OMC 3.7
ED Viewer IODB 19.04.04

Fixed SPRs in core v10.8.0:

PHS:

SPR 630 Cache not flushed. Fixed, OSS was using the PHS connection
SPR 651 The AO selection for Amalgamation preparation was shown in a listbox which did not scroll, therefor in could only show 3 AO's. This has been replaced by a Combobox which now shows all AO's available in the database
SPR 657 On Linux the ProposalSelection screen freezes whet it is started as the first screen, this is now fixed

OSS:

SPR 649 Fixed, SPR was actually on PHS instead of OSS
SPR 654 Inaccurate wandering COP navigation, Fixed
SPR 658 Incorrect Misalignment, since lauch we do an incorrect correction for SPI misalignment, i.e., we do NOT point the satellite such that a source falls at the center of the FOV of an instrument. This problem was idependently reported by the IBIS team at the ISWT in Jan. 2005, and by going thoug the OSS code to implemt SCREW 461. Problem fixed, confirmed by the OMC team

WEB:

SPR 659 Can not raise SPR's and SCREWS, cause by the web server migration of RSSD, now fixed

Implemented SCRs in core v10.8.0:

PHS:

SCR 461 The misalignment now depends on the prime instrument setting, an extra option is added, startracker. If the Startracker is selected there is no misalignment correction done for any instrument. Chosing one of the Instruments mean that a misaligment is performed for the selected instrument, option "Both" means 'SPI' (as previously)

Fixed SPRs in DB v4.1.6:

SPR 660 Fixed