Author: | Paul Balm [paul.balm@esa.int] |
Date: | 04-06-2007 |
Summary: | Bulk change to statuses |
System name | ID | Version |
---|---|---|
ISOC Core System (PHS, OSS and CSS) | core | 12.7 (new) |
ISOC Database | DB | 7.5 |
ISOC FD Server application | fdserver | 2.2 |
ISOC Web | web | 5.5 |
Proposal Generation Tool | PGT | 5.4 |
Proposal Receiver | PRV | 5.0 |
Proposal Loader | PLD | 5.0 |
Mailer Daemon | MLR | 5.0 |
Push Pull Daemon | PPD | 2.0 |
ISOC Observing Time Estimator | ote | 5.3 |
ISOC Target Visibility Predictor | TVP | 4.1 |
External dependencies:
System name | ID | Version |
---|---|---|
Integral File Transfer System | IFTS | 2.0 |
Flight Dynamics Software | FDS | 2.2i |
Database of Observable Bins | DBOB | 88 |
Optical Monitoring Camera Pointing Software | OMC | 3.7 |
OMC Source Catalogue | OMC_CAT | 5 |
ED Viewer | IODB | 20.02.07 |
![]() |
SCR 590 | It is now possible in PHS to change the status of all sources on a Key Programme subscription, or a subset thereof. |
![]() |
SCR 592 | When changing the status of observations on a proposal from Validated to Approved, user input is required to enable the proposal to be saved. Observations that have been set to Approved, will also need to have their priority and approved time set. When, in the bulk status change dialog, the user selects to change observations to Approved, an additional dialog is presented, asking the user to enter priority and approved time. The entered information will be applied to all the relevant observations. |