Software Release Note for ISOC version 23.0

(click here for SRN history)

Author: Silvia de Castro [scastro@sciops.esa.int]
Date: 01-09-2009
Summary: TAC preparation and post-TAC procedures

Dependencies

System name ID Version
ISOC Core System (PHS, OSS and CSS) core 14.5 (new)
ISOC Database DB 9.1 (new)
ISOC FD Server application fdserver 2.3
ISOC Web web 7.3
Proposal Generation Tool PGT 7.1
Proposal Receiver PRV 7.1
Proposal Loader PLD 7.1
Mailer Daemon MLR 7.1
Push Pull Daemon PPD 3.0
ISOC Observing Time Estimator ote 7.0
ISOC Target Visibility Predictor TVP 4.4

External dependencies:

System name ID Version
Integral File Transfer System IFTS 2.0
Flight Dynamics Software FDS 2008.2i
Database of Observable Bins DBOB 110
Optical Monitoring Camera Pointing Software OMC 3.7
OMC Source Catalogue OMC_CAT 5
ED Viewer IODB 3.1-059-09.03.09 (new)

Fixed SPRs in core v14.5:

PHS:

SPR 0001041 In the detailed proposal view, the observation number navigation arrow is re-initialized correctly in this version.
SPR 0001078 Source list of subscriptions was not correctly seen under PHS after number 30. This has been fixed.

Implemented SCRs in core v14.5:

PHS:

SCR 0001042 Check of total TM allocation has been added in order to warn the user.
SCR 0001018 The KP PI + subscribers are now in the e-mail destination of the scheduled notification e-mail.
SCR 0001019 When doing replanning a new warning window has been set up for reminding the user to set the RWB
SCR 0001058 The Prime instrument now has "Star Tracker" option instead of "None"
SCR 0001082 PHS allows now to reject/approve an association depending on the visibility of the sources included in the subscription related to the expected exposure map

Implemented SCRs in DB v9.1:

SCR 0001082 Be able to reject an association