| Author: | Silvia de Castro [scastro@sciops.esa.int] |
| Date: | 22-09-2008 |
| Summary: | Urgent release for updating "Amalgamation" with new 5x5 sequential pattern |
| System name | ID | Version |
|---|---|---|
| ISOC Core System (PHS, OSS and CSS) | core | 13.4 (new) |
| ISOC Database | DB | 8.6 (new) |
| ISOC FD Server application | fdserver | 2.3 |
| ISOC Web | web | 6.3 |
| Proposal Generation Tool | PGT | 5.9 |
| Proposal Receiver | PRV | 5.1 |
| Proposal Loader | PLD | 5.6 |
| Mailer Daemon | MLR | 5.2 |
| Push Pull Daemon | PPD | 3.0 |
| ISOC Observing Time Estimator | ote | 5.6 |
| ISOC Target Visibility Predictor | TVP | 4.4 |
External dependencies:
| System name | ID | Version |
|---|---|---|
| Integral File Transfer System | IFTS | 2.0 |
| Flight Dynamics Software | FDS | 2008.2i |
| Database of Observable Bins | DBOB | 95 |
| Optical Monitoring Camera Pointing Software | OMC | 3.7 |
| OMC Source Catalogue | OMC_CAT | 5 |
| ED Viewer | IODB | 3.1-057-26.05.08 |
![]() |
SPR 917 | The PAD/IOP is now correctly generated also for calibration proposals |
![]() |
SPR 717 | Amalgamation is now prepared for accepting 5x5 sequential for amalgamating observations |
![]() |
SPR 921 | Incorrect dwell time in observations updated with bulk change are now corrected and the code is fixed in bulk change functionality |
![]() |
SCR 700 | Arrows have been added to PHS-Proposal Details GUI, observation lists in order to facilitate navigation |
![]() |
SPR 717 | Amalgamation tables were not prepared to support observations with the new pattern 5x5 sequential. A_OFFAXIS table has been updated in order to support this |